The interrupts must be disabled before considering the need resched bit of the task struct and they have to be disabled before calling schedule() Signed-off-by: Sebastian Siewior <bigeasy@linutronix.de> Signed-off-by: Greg Ungerer <gerg@uclinux.org> Signed-off-by: Linus Torvalds <torvalds@linux-foundation.org> |
||
|---|---|---|
| .. | ||
| dma.c | ||
| entry.S | ||
| head.S | ||
| Makefile | ||
| pit.c | ||
| timers.c | ||
| vectors.c | ||